**TODO** more tariff
    **TODO** more tariff
    No base fee for one year in the Transit tariff + 150 GBP credit with your new fully electric Audi 1

    Transit

    for fully electric Audi vehicles

    Do you charge frequently on the road and prefer to do so quickly? Then our Transit tariff is just right for you - including discounted IONITY high power charging. Our recommendation for long-distance and electric car drivers.

    Fixed fees

    Activation fee
    -
    Base fee
    16.81 GBP / month

    Domestic charging fees

    AC charging (standard charging)
    0.29 GBP / kWh
    DC/HPC charging (fast charging) 2
    0.39 GBP / kWh
    IONITY HPC
    0.28 GBP / kWh
    bp pulse
    AC-charging (7.4kW)
    0.20 GBP/kWh

    43 kW AC / 50 kW DC charging
    0.29 GBP/kWh + 10.00 GBP / hour after 90 mins

    120kW and above DC charging
    0.42 GBP/kWh + 10.00 GBP / hour after 90 mins
    Pod Point
    Prices at the operator Pod Point may vary over time and between locations. For more information about Pod Point pricing, please access the myAudi app, select a charging station and tap on the price link.
    Source London
    AC-charging (7.4kW)
    0.08 GBP / min

    AC-charging (22kW)
    0.14 GBP / min

    Additional tariff information

    Minimum contract period 3
    1 year
    Replacement card
    6.84 GBP

    Charging fees abroad

    City

    for partially and fully electric Audi vehicles

    For all those who rather cover short distances and still want to remain flexible: With our City tariff, you can charge cheaply on the road if you have to. Particularly suitable for city commuters and plug-in hybrid drivers.

    Fixed fees

    Activation fee
    0.00 GBP
    Base fee
    4.91 GBP / month

    Domestic charging fees

    AC charging (standard charging)
    0.29 GBP / kWh
    DC/HPC charging (fast charging) 2
    0.39 GBP / kWh
    IONITY HPC
    0.70 GBP / kWh
    bp pulse
    AC-charging (7.4kW)
    0.20 GBP/kWh

    43 kW AC / 50 kW DC charging
    0.29 GBP/kWh + 10.00 GBP / hour after 90 mins

    120kW and above DC charging
    0.42 GBP/kWh + 10.00 GBP / hour after 90 mins
    Pod Point
    Prices at the operator Pod Point may vary over time and between locations. For more information about Pod Point pricing, please access the myAudi app, select a charging station and tap on the price link.
    Source London
    AC-charging (7.4kW)
    0.08 GBP / min

    AC-charging (22kW)
    0.14 GBP / min

    Additional tariff information

    Minimum contract period 3
    indefinite
    Replacement card
    6.84 GBP

    Charging fees abroad

    Optional package(s) that you can subscribe to after finishing the registration:

    bp pulse

    bp pulse
    Base fee
    7.85 GBP / month 
    AC charging (standard charging)
    to 40 kW
    0.16 GBP / kWh
    from 41 kW
    0.23 GBP / kWh
    from 90 minutes from 41 kW
    + 10.00 GBP / 60 min
    DC/HPC charging (fast charging)
    to 51 kW
    0.23 GBP / kWh
    from 90 minutes to 51 kW
    + 10.00 GBP / 60 min
    from 52 kW
    0.27 GBP / kWh
    from 90 minutes from 52 kW
    + 10.00 GBP / 60 min

    For more information about the bp pulse subscription and network please click here.

    All prices include VAT

    *Pricelist and product information sheet
    Download

    -

    1. Customers who have registered for the Transit tariff and have purchased a fully electric Audi as a new vehicle are exempt from the base fee for the first year. Your new vehicle must correspond to either the current or the previous model year. The offer is only valid for the first contract and cannot be transferred to others. After one year the normal tariff conditions apply. The Audi AG promotion is automatically put into effect for one year when your charging contract is activated. Activation is possible until 31.12.2021. Plug-in hybrid vehicles are excluded from this offer. Audi UK terms and conditions apply. For further information please visit https://www.audi.co.uk/electric/charging/e-tron-charging-service.html

    2. Also includes the HPC offering from other HPC providers besides IONITY

    3. The transit tariff contract has a fixed term of 12 months and may be terminated by both parties with a notice period of two weeks to the end of the respective contract period. If the contract is not terminated on time, the contract period is extended by a further 12 month period. The city tariff contract has an indefinite term and can be terminated by either party by giving one month’s notice starting from the end of the current month.